Completed Portfolio of Projects PADP Involved in


DPW: Montclair Police Station and Maphumulo Prison Site Clearance
Tasks & Responsibilities:
  • Site Audit
  • Project Management
Salisbury Island Car Terminal Town Planning Input
  • Capacity:
    • Town Planner / Environmental Consultant
  • Period:
    • 2006
  • Tasks & Responsibilities:
    • Site Analysis (Salisbury Island)
    • Alternative Sites Investigation
    • Investigation of Environmental Requirements
Engen EIA
  • Capacity:
    • Public Participation Consultant
  • Period:
    • 2004 - 2005
  • Tasks & Responsibilities:
    • Public Participation

Point Canal Phase II Exemption
  • Capacity:
    • EIA Consultant
  • Period:
    • 2006
  • Tasks & Responsibilities:
    • Exemption Application for Point Canal Phase II
Durban Point Development Company
  • Capacity:
    • Facilitator
  • Period:
    • 2004 - 2005
  • Tasks & Responsibilities:
    • DWAF Permit Application to Discharge Water into the Harbour

EnviroServ Buffer Zone Management and Monitoring
  • Capacity:
    • Town Planner
  • Period:
    • 2006
  • Tasks & Responsibilities:
    • Undertake investigation on emerging developments and land uses surrounding the EnviroServ landfill sites
    • Monitoring and Management of landfill site buffer zone
Enviroserv Autoclave EIA
  • Capacity:
    • EIA Consultant
  • Period:
    • 2006
  • Tasks & Responsibilities:
    • Environmental Impact Assessment for a Medical Waste Management Facility i.e. Autoclave Technology
Kassier Road EIA
  • Capacity:
    • EIA Consultant
  • Period:
    • 2006
  • Tasks & Responsibilities:
    • Environmental Impact Assessment
Outer West Shongweni/M13 EIA
  • Capacity:
    • EIA Consultant
  • Period:
    • 2006
  • Tasks & Responsibilities:
    • Environmental Impact Assessment
Vukani Access Road Phase 2
  • Capacity:
    • EIA Consultant
  • Period:
    • 2004 - 2006
  • Tasks & Responsibilities:
    • Environmental Impact Assessment
DSW Waste Transfer Station EIA
  • Capacity:
    • Public Participation Consultant
  • Period:
    • 2004 - 2006
  • Tasks & Responsibilities:
    • Public Participation
Durban Point Development Company
  • Capacity:
    • Facilitator
  • Period:
    • 2004 - 2005
  • Tasks & Responsibilities:
    • DWAF Permit Application to Discharge Water into the Harbour
Local Government & Water Related Services Education & Training Authority (LGWSETA)
  • Capacity:
    • Education and Training: Project Management & Contract Management
  • Period:
    • 2003 - 2004
  • Tasks & Responsibilities:
    • Training of municipalities in project and contract management
    • Preparation of training modules
Durban Point Development Company
  • Capacity:
    • Point Small Craft Harbour
  • Period:
    • 2003 - 2006
  • Tasks & Responsibilities:
    • Environmental Impact Assessment
Durban Point Development Company
  • Capacity:
    • Point Canals Exemption
  • Period:
    • 2003 - 2006
  • Tasks & Responsibilities:
    • Section 22 Application for Exemption
Vantage Training
  • Capacity:
    • Facilitator
  • Period:
    • 2003
  • Tasks & Responsibilities:
    • Training of government officials in IDP
Free Start Battery cc
  • Capacity:
    • EIA Consultant
  • Period:
    • 2003
  • Tasks & Responsibilities:
    • Compilation of the EIA Report and Environmental Management Plan (EMP) for the proposed relocation of a lead smeltering operation
Hawaan Forest Development Project
  • Capacity:
    • Lead Consultant
  • Period:
    • 2003
  • Tasks & Responsibilities:
    • Appointed by the City Manager to lead the professional team in addressing issues relating to the EIA for the Hawaan Forest Development Project
Comments on Principles for Legislation
  • Capacity:
    • Policy & Research
  • Period:
    • 2003
  • Tasks & Responsibilities:
    • Review of Land Use Principles for KZN
EIA for the proposed incinerator at the Shongweni Landfill site
  • Capacity:
    • Environmental Consultant
  • Period:
    • 2003 - 2004
Information gathering for MCA Urban & Environmental Planners
  • Capacity:
    • Policy & Research
  • Period:
    • 2003
Nxamalala, Nkandla
  • Capacity:
    • Environmental Consultant
  • Period:
    • 2002 - 2003
  • Tasks & Responsibilities:
    • Environmental Management Plan for the Construction of a Prison at Nkandla
Nxamalala, Nkandla
  • Capacity:
    • Environmental Consultant
  • Period:
    • 2002 - 2003
  • Tasks & Responsibilities:
    • Environmental Scoping Process for the Construction of a Prison at Nkandla
DSW Shongweni South Candidate Landfill Site
  • Capacity:
    • EIA Consultant
  • Period:
    • 2002 - 2005
Point Navigable Canal Phase 1
  • Capacity:
    • Environmental Consultant
  • Period:
    • 2002 - 2003
  • Tasks & Responsibilities:
    • Undertaking of EMP for the Navigable Canal Phase I
Point Marine Park Development
  • Capacity:
    • Environmental Consultant
  • Period:
    • 2002
  • Tasks & Responsibilities:
    • Compilation of the EMP for Durban Point Waterfront Marine Park including Generic EMP, Excavation EMP, Piling EMP
Isipingo Island Institute
  • Capacity:
    • Facilitator
  • Period:
    • 2002
  • Tasks & Responsibilities:
    • Facilitation of EIA process in terms of the environmental regulations\
Hosaf Fibres
  • Capacity:
    • Facilitator
  • Period:
    • 2002 - 2003
  • Tasks & Responsibilities:
    • Conceptualization and facilitation of a Good Neighbour Agreement amongst stakeholders
Nkandla
  • Capacity:
    • Town and Regional Planner
  • Period:
    • 2002 - 2003
  • Tasks & Responsibilities:
    • Site Identification and Preparation for the Construction of a Prison at Nkandla
Isipingo Mbokodweni CMA
  • Capacity:
    • Facilitator
  • Period:
    • 2001
  • Tasks & Responsibilities:
    • Facilitation of Catchment Fora in terms of the National Water Act
EIA For Point Marine Theme Park
  • Capacity:
    • EIA Consultant and Public Participation Consultant
  • Period:
    • 2001 - 2002
  • Tasks & Responsibilities:
    • Undertaking of the complete Environmental Impact Assessment. in terms of the Environmental Conservation Act Regulations and National Environment Management Act (NEMA)
Durban Fibres EIA Process
  • Capacity:
    • Public Participation Consultant
  • Period:
    • 2001 - 2002
  • Tasks & Responsibilities:
    • Undertaking Public Participation in terms of the Environmental Impact Assessment Regulations and National Environment Management Act (NEMA), including the Environmental Management Plan
Mondi EIA
  • Capacity:
    • Public Participation Consultant
  • Period:
    • 2001 - 2003
  • Tasks & Responsibilities:
    • Undertaking Public Participation in terms of the Environmental Impact Assessment Regulations and National Environment Management Act (NEMA), including the Environmental Management Plan
EIA for Waste Services Logmed Unit
  • Capacity:
    • EIA Consultant
  • Period:
    • 2001
  • Tasks & Responsibilities:
    • Undertaking the Environmental Impact Assessment for a medical waste treatment facility
DWAF Catchment Management Agency (CMA) and Proposal Development Working Group (PDWG)
  • Capacity:
    • Facilitator
  • Period:
    • 2001 - 2002
  • Tasks & Responsibilities:
    • Facilitating and managing the establishment of Catchment Management Agencies in terms of the National Water Act
DWAF DANCED IWRM Project
  • Capacity:
    • Policy Formulation
  • Period:
    • 2001 - 2002
  • Tasks & Responsibilities:
    • Formulation of Communication Strategy for Integrated Water Resources Management (IWRM)
    • Conducting Public Awareness Campaigns
EIA for Durban Point Waterfront Development: Navigable Canal Phase One
  • Capacity:
    • Environmental Consultant
  • Period:
    • 2001 - 2002
  • Tasks & Responsibilities:
    • Undertaking of the complete E.I.A. in terms of the Environmental Conservation Act Regulations and National Environment Management Act (NEMA)
Rezoning for Lot 1259, Westville
  • Capacity:
    • Town Planner
  • Period:
    • 2001
  • Tasks & Responsibilities:
    • Rezoning of Property in terms of the Town Planning Ordinance 27 of 1949
Rezoning for Star Foodmarket
  • Capacity:
    • Town Planner
  • Period:
    • 2001
  • Tasks & Responsibilities:
    • Rezoning of Property in terms of the Town Planning Ordinance 27 of 1949
N2 Wild Coast Toll Road Project (KwaZulu-Natal)
  • Capacity:
    • Public Participation Consultant
  • Period:
    • 2001 - 2003
  • Tasks & Responsibilities:
    • Public Participation Process as stipulated by Regulations 1182 - 1184 of the Environmental Conservation Act and National Environment Management Act (NEMA)
Durban Metropolitan Open Space Systems (DMOSS)
  • Capacity:
    • Policy Formulation
  • Period:
    • 2001
  • Tasks & Responsibilities:
    • Research into Open Space Systems; its value and place in environmental and development planning
Greylands Housing Project
  • Capacity:
    • Environmental Consultant
  • Period:
    • 2000
  • Tasks & Responsibilities:
    • Preparation of an Environmental Management Plan and advisor on environmental issues in terms of Environmental Management Plan
Greylands Housing Project
  • Capacity:
    • Town Planner
  • Period:
    • 2000
  • Tasks & Responsibilities:
    • Preparation, compilation and advisor to NLC on township application in terms of Development Facilitation Act
Greylands Housing Project
  • Capacity:
    • EIA Consultant
  • Period:
    • 2000
  • Tasks & Responsibilities:
    • Undertaking EIA for a low-cost housing project
Catchment Management Process for the Mvoti to Mzimkulu Catchment Management Agency
  • Capacity:
    • Manager and Facilitator
  • Period:
    • 2000 - 2002
  • Tasks & Responsibilities:
    • Identification of Stakeholders
    • Compilation and Management of Database
    • Preparing, planning, co-ordinating and convening workshops
    • Facilitating process of the establishment of the Catchment Management Agency
Seaview
    • Capacity:
      • Town Planner
    • Period:
      • 2000
    • Tasks & Responsibilities:
      • Investigation into property restrictions and Town Planning regulations
Indlovu Regional Council
  • Capacity:
    • Town & Regional Planner
  • Period:
    • 1999
  • Tasks & Responsibilities:
    • Evaluation for purposes of demarcation
Mzimayi River Catchment Management Forum
  • Capacity:
    • Organizational Development Consultant
  • Period:
    • 1999
  • Tasks & Responsibilities:
    • Compilation of document of proceedings of workshop and write-up and identification of possible impacts, evaluation and
Redsand Gardens
  • Capacity:
    • Town Planner
  • Period:
    • 1999
  • Tasks & Responsibilities:
    • Layout of private township for 500 sites
    • Township establishment in respect of Private Township Board
Durban Water Recycling Project
  • Capacity:
    • Environmental Scoping Consultant
  • Period:
    • 1999
  • Tasks & Responsibilities:
    • Part of Environmental Scoping Study (ESS) for a water recycling project
Ekuvukeni
  • Capacity:
    • Town Planner
  • Period:
    • 1999
  • Tasks & Responsibilities:
    • To research and identify the most appropriate and affordable site / land for the required service, including site creation, site procurement and site release.
Sithembile Ext. 2 (Glencoe)
  • Capacity:
    • Project Evaluator
  • Period:
    • 1999
  • Tasks & Responsibilities:
    • Evaluate project on behalf of the KZN Provincial Housing Board according to established guidelines
Emafusini Kwa Mashu
  • Capacity:
    • Project Evaluator / Project Facilitator
  • Period:
    • 1998 - 1999
  • Tasks & Responsibilities:
    • Evaluate project on behalf of the KZN Provincial Housing Board according to established guidelines
    • Preparation and compilation of a status quo report for Section “L” Development Committee
Sub 169 (of 168) of the Farm Clairwent Three No. 14836
  • Capacity:
    • Town & Regional Planner Development Control
  • Period:
    • 1998
  • Tasks & Responsibilities:
    • Property investigation and feasibility for commercial activity
Sub 12 of the farm Hammarsdale: Regulated area of Sterkspruit
  • Capacity:
    • Town & Regional Planner Development Control
  • Period:
    • 1998
  • Tasks & Responsibilities:
    • Property investigation and feasibility for commercial activity
Sub 1 of Lot 2 of the farm Dassenhoek No. 943
  • Capacity:
    • Town & Regional Planner Development Control
  • Period:
    • 1998
  • Tasks & Responsibilities:
    • Property investigation and feasibility for commercial activity
Lot 559 Port Edward / Lot 303 Glenmore / Lot 154 Leisure Bay
  • Capacity:
    • Town & Regional Planner Development Control
  • Period:
    • 1998
  • Tasks & Responsibilities:
    • Property rezoning and feasibility for holiday resort
Restrictions on land regarding Sub 8 of 4831 Queensburgh: 3 Vera Rd
  • Capacity:
    • Town & Regional Planner Development Control
  • Period:
    • 1998
  • Tasks & Responsibilities:
    • Property rezoning for commercial activity
Sappi Saiccor Permit Advisory Process
  • Capacity:
    • Project Facilitator
  • Period:
    • 1999 - 2004
  • Tasks & Responsibilities:
    • Facilitator to Permit Advisory Panel (PAP)
Mondi EIA Process
  • Capacity:
    • Project Facilitator
  • Period:
    • 1998 - 2003
  • Tasks & Responsibilities:
    • Social Advisor and Manager of Process
Selection of Large General Landfill Sites in the Durban Metropolitan Area
  • Capacity:
    • Project Facilitator
  • Period:
    • 1998 - 2002
  • Tasks & Responsibilities:
    • Advisor of Social Process and Manager of interests in the process; co-ordinating activities and general monitoring of progress of the 3 Site Evaluation Committees and the Technical Working Committee
Bul-bul Drive Landfill Site
  • Capacity:
    • Project Facilitator
  • Period:
    • 1998 - 2001
  • Tasks & Responsibilities:
    • Facilitator to the Bul-bul Drive Landfill Site Monitoring Committee
Greylands Housing Project
  • Capacity:
    • Town Planner
  • Period:
    • 1998 - 2000
  • Tasks & Responsibilities:
    • Settlement Planning
    • Social Consultant
    • Environmental Scoping Consultant
    • Township Establishment via Development Facilitation Act
Island View – Environmental Conflict, Durban
  • Capacity:
    • Project Facilitator
  • Period:
    • 1997
  • Tasks & Responsibilities:
    • Facilitator for dispute over environmental issues between the Bluff residents and 22 industries in Island View
KZN Provincial Workshop on Local Agenda 21
  • Capacity:
    • Project Facilitator
  • Period:
    • 1997
  • Tasks & Responsibilities:
    • Once-off facilitation of a workshop in a national conference
Austerville Housing
  • Capacity:
    • Project Manager
  • Period:
    • 1997 - 1998
  • Tasks & Responsibilities:
    • Facilitation and management of process leading to a status quo report in terms of housing situation in Austerville
Landfill Planning Consortium
  • Capacity:
    • Development Planner
  • Period:
    • 1997 - 1998
  • Tasks & Responsibilities:
    • Appointed as part of a consortium for Planning Guidelines for Land Use for Landfill Sites in KwaZulu-Natal
Shongweni Landfill Site (Enviroserv)
  • Capacity:
    • Project Facilitator
  • Period:
    • 1997 - 2003
  • Tasks & Responsibilities:
    • Facilitator of the processes for the Shongweni Landfill Site
Shongweni Landfill Site (Enviroserv)
  • Capacity:
    • Consultant to COTA (A UK-based agency in Brussels)
  • Period:
    • 1997
  • Tasks & Responsibilities:
    • Consultant on “European Union Study into De-centralized Cooperation in SA”.
Bayer Plant Expansion, Merebank
  • Capacity:
    • Project Facilitator
  • Period:
    • 1997
  • Tasks & Responsibilities:
    • Consultant on “European Union Study into De-centralized Cooperation in SA”
Piesangs (Soweto) Housing Upgrade Project
  • Capacity:
    • Facilitator & Project Manager
  • Period:
    • 1996 - 2000
  • Tasks & Responsibilities:
    • Appointed by the City of Durban as facilitator and project manager to unblock and kickstart the upgrade of an informal settlement that began in 1991/92 in the dense Inanda area
Isipingo, IEM Process
  • Capacity:
    • Facilitator & Project Manager
  • Period:
    • 1996
  • Tasks & Responsibilities:
    • Facilitation of the IEM process for the Expansion of a Food Industry Plant (NCP) at Isipingo
Umlazi IV Landfill Site (Enviroserv)
  • Capacity:
    • Project Facilitator
  • Period:
    • 1996 - 2003
  • Tasks & Responsibilities:
    • Facilitation of the process leading up to the closure and rehabilitation of the Umlazi IV Landfill Site on instruction from the Minister of Water Affairs, Prof. Kader Asmal
Wentworth, Environmental Project, Jacobs
  • Capacity:
    • Project Facilitator
  • Period:
    • 1996 - 1998
  • Tasks & Responsibilities:
    • Facilitator of the Integrated Environmental Management (IEM) process between a Committee of Stakeholders comprising of Wentworth Development Forum, the City of Durban and Hoechst (SA) Pty, Ltd
Malagazi Housing Project, Durban
  • Capacity:
    • Social Consultant
  • Period:
    • 1996 - 1998
  • Tasks & Responsibilities:
    • Social consultant for part development and project packaging for whole of Malagazi
Waterloo Housing Project

  • Capacity:
    • Socio-Economic Development Consultant
  • Period:
    • 1994 - 1997
  • Tasks & Responsibilities:
    • Conceptualizing housing support centres
    • Encouraging medium and small enterprise
    • Local economic development
    • Capacity building & organisational support to non-statutory participants
    • Facilitating Social Compact formation
    • Technical housing support to resident
Westrich, Township Planning, Durban
  • Capacity:
    • Town Planner (in association with Vines Mikula & Associates, Town & Regional Planners)
  • Period:
    • 1996 - 1997
  • Tasks & Responsibilities:
    • Conceptualization of Town Planning and feasibility study into low-cost housing for 1100 sites
Old Dunbar, Cato Manor Housing Project
  • Capacity:
    • Project Manager
  • Period:
    • 1995 - 1996
  • Tasks & Responsibilities:
    • Feasibility, project packaging & Subsidy application
Welbedagt-West, Housing Project, Durban
  • Capacity:
    • Assistant Project Leader & Development Facilitator
  • Period:
    • 1994 - 1996
  • Tasks & Responsibilities:
    • Overall co-ordination at assistant / training level
    • Social Compact facilitation
    • Capacity building with respect of workshops on housing and development
Wiggins Fast-track Housing Development
  • Capacity:
    • Development Facilitator
  • Period:
    • 1994 - 1995
  • Tasks & Responsibilities:
    • Identifying relevant stakeholders
    • Assessing attitudes to development
    • Investigating structures for consultation
    • Capacity building
    • Social consultant to CEO of CMDA – Wiggins precinct
Presidential-led Project of the RDP in Cato Manor in Durban
  • Capacity:
    • Advisor & Development Consultant to Cato Manor Development Association
  • Period:
    • 1994 - 1995
  • Tasks & Responsibilities:
    • Development workshops around housing
    • Project proposal preparation
    • Capacity building around housing
    • Facilitation & conflict resolution